Although the dashboard fixed in place sufficiently with the 4 fixing bolts cast into the GRP moulding, the centre of the dashboard still seemed to flex with the bottom edge not fitting far enough back to avoid catching it when changing gear. An angle bracket was made up from flat aluminium bar, bent to suit, fixed down onto the centre tunnel with rivnuts and bolts. The centre console of the dashboard was then fixed to the bracket with rivnuts and button headed screws.

The stainless steel door sills were stuck in place with Sikaflex although the ends did need shaping to fit snugly against the rounded edges of the centre scuttle and rear tub. Whilst the sealant cured the trims were held in place with a couple of large adjustable clamps.

  

  

 

 

 

 

December

Registration

November

speedo sensor, bonnet catches, final trim, MOT & SVA

October

Nosecone, Rear tub, front mudguards, alarm

June

Finishing fitting the dashboard

April

Carpets, seats and Dashboard

March

Making a start on the interior

February

Lights working

December

Bonnet, Nosecone, Headlights

November

1st drive

August

Rear mudguards and lights

July

Engine loom wiring, Alternator bracket, Distributor, Engine Started, Speedo sensor, Transmission tunnel fitting, Exhausts, Side panels

June

Steering column, Front axle, Pedal box, Wheel studs, Fuel tank, Wiring loom, Rear tub, Remote oil filter, Front bulkhead / battery shelf, Column switches

May

Footwell panels, Rear axle, Brake pipes, Rear bulkhead, Fuel pump, Engine installed

April

Collect kit from Dax, Painting chassis, Remote oil filter takeoff plate, Floor panels, A frame bushes

March

Gearstick remote, Baffled sump

February

Preparing LT77 gearbox, exhaust options, Costs for kit

January

3.62:1 LSD

December

Front hub bearings, Engine age

November

Preparing donor differential, drive shafts, hubs