Revised 31/12/2011 .

Build Diary Index

 

 

 

Hopefully the photo's of this months work will be self explanatory. The photo showing the bulbs is as a reminder that the brake and indicator bulbs supplied with the Dax rear lights need to be changed to a bigger 12V 21W bulb. This will mean that the brake lights are brighter than the side lights, and that the indicator relay will flash at the correct rate.

  

     

  

  

  

 

 

 

 

 

December

Registration

November

speedo sensor, bonnet catches, final trim, MOT & SVA

October

Nosecone, Rear tub, front mudguards, alarm

June

Finishing fitting the dashboard

April

Carpets, seats and Dashboard

March

Making a start on the interior

February

Lights working

December

Bonnet, Nosecone, Headlights

November

1st drive

August

Rear mudguards and lights

July

Engine loom wiring, Alternator bracket, Distributor, Engine Started, Speedo sensor, Transmission tunnel fitting, Exhausts, Side panels

June

Steering column, Front axle, Pedal box, Wheel studs, Fuel tank, Wiring loom, Rear tub, Remote oil filter, Front bulkhead / battery shelf, Column switches

May

Footwell panels, Rear axle, Brake pipes, Rear bulkhead, Fuel pump, Engine installed

April

Collect kit from Dax, Painting chassis, Remote oil filter takeoff plate, Floor panels, A frame bushes

March

Gearstick remote, Baffled sump

February

Preparing LT77 gearbox, exhaust options, Costs for kit

January

3.62:1 LSD

December

Front hub bearings, Engine age

November

Preparing donor differential, drive shafts, hubs