When sticking down the carpets I used both spray on evostick contact adhesive and paint on evostick contact adhesive. Whilst the spray was easier to apply, the paint on adhesive gave a far better bond and I have since had to re apply glue to the edges of some of the carpet stuck with the spray.

         

To fix the seats in place, An aluminium angle was fixed to the front edge of the seats which was in turn fixed to the chassis cross-member as shown in the photo below

       

The moulded dashboard didn't seem to fix back properly into place and it soon became apparent that there was a lump in the edge of the dashboard wherever the leather covering had been stitched. The solution was to peel back the leather covering and filing out a notch in the GRP to take-up the excess material.  

     

  

 

 

 

December

Registration

November

speedo sensor, bonnet catches, final trim, MOT & SVA

October

Nosecone, Rear tub, front mudguards, alarm

June

Finishing fitting the dashboard

April

Carpets, seats and Dashboard

March

Making a start on the interior

February

Lights working

December

Bonnet, Nosecone, Headlights

November

1st drive

August

Rear mudguards and lights

July

Engine loom wiring, Alternator bracket, Distributor, Engine Started, Speedo sensor, Transmission tunnel fitting, Exhausts, Side panels

June

Steering column, Front axle, Pedal box, Wheel studs, Fuel tank, Wiring loom, Rear tub, Remote oil filter, Front bulkhead / battery shelf, Column switches

May

Footwell panels, Rear axle, Brake pipes, Rear bulkhead, Fuel pump, Engine installed

April

Collect kit from Dax, Painting chassis, Remote oil filter takeoff plate, Floor panels, A frame bushes

March

Gearstick remote, Baffled sump

February

Preparing LT77 gearbox, exhaust options, Costs for kit

January

3.62:1 LSD

December

Front hub bearings, Engine age

November

Preparing donor differential, drive shafts, hubs